QUESTION 51

You have been contacted by a medium sized medical center to do a site survey of their existing WLAN. The current network is set up with multiple SSIDs/VLANs to separate voice and data and the networks functioning properly. The medical center would like to add Vocera voice badges to the existing VoWLAN. Which two issues need to be considered during the site survey? (Choose two.)

 

A.

The additional voice endpoints may increase additional load, which may increase delay in the WLAN and cause voice quality to degrade.

B.

There will not be any issues due to adding the Vocera voice badges because they are point-to-point devices and do not require the infrastructure to communicate.

C.

Verify the WLAN is multicast enabled for Vocera voice badges.

D.

To make these devices as efficient as possible, the Vocera voice badges should be placed on their own unicast SSID/VLAN.

E.

Verify the WLAN that is being used by the Vocera voice badges is configured in the WLC to use the Gold QoS value.

 

Correct Answer: AC

 

 

QUESTION 52

You have a client that would like to upgrade their 2.4-GHz point-to-point wireless bridge link between buildings in their facility in Mexico. Currently, they have radios from vendor A that are transmitting at 14 dBm with 6 dBm antennas. They would like to upgrade the radios to vendor B but keep the existing antennas. The new radios from vendor B have a fixed transmit power of 7 dBm. How should you proceed?

 

A.

Install the new radios with existing vendor A antennas.

B.

Install new radios with replacement vendor A antennas rated at 13 dBm.

C.

Install new radios with replacement vendor A antennas rated at 30 dBm.

D.

Install the new radios with new vendor B antennas rated at 29 dBm.

E.

Install the new radios with new vendor B antennas rated at 13 dBm.

 

Correct Answer: E

 

 

QUESTION 53

You have a customer that operates a large open pit coal mine in the western United States. They need to deploy a wireless point-to-point bridge link across the mine. The distance of the link is 1.5 miles. Which three things do you need to consider prior to performing the site survey for this bridge link? (Choose three.)

 

A.

What specific EPA training will be required prior to entering the customer site?

B.

Is a specific Mine Safety and Health Administration training course and certificate required prior to entering the customer site?

C.

What specific FCC training will be required prior to entering the customer site?

D.

Will any specialized equipment or clothing will be required to perform the site survey?

E.

Will customer escorts be needed during the site survey?

 

Correct Answer: BDE

 

 

 

 

QUESTION 54

Which three types of infrastructure issues need to be verified prior to performing a wireless site survey? (Choose three.)

 

A.

MDF and IDF closet locations and if the cable that runs from each closet can reach the proposed AP locations.

B.

Available riser capacity for additional backbone cable connections

C.

VLAN and IP address deployment strategy

D.

Status of QoS deployed

E.

Electrical capacity for each MDF and IDF

F.

HVAC capacity for each MDF and IDF

G.

Locations of application servers

 

Correct Answer: ACD

 

 

QUESTION 55

Which three things do you need to consider prior to performing a wireless site survey? (Choose three.)

 

A.

The time required to acquire any additional infrastructure components.

B.

The time required to survey each potential AP location.

C.

The time required to assess application server locations at the customer facility.

D.

The type of wireless survey tools required to perform the site survey.

E.

The time required to assess customer WLAN density and throughput requirements.

F.

The time required to utilize the design mode in Cisco WCS to prepare a preliminary WLAN design to reduce on-site survey time.

 

Correct Answer: BDE

 

 

QUESTION 56

Which infrastructure issue needs to be verified and potentially resolved before deploying a centralized 802.11n WLAN?

 

A.

That all the access layer switches that the 802.11n APs will connect to support 802.3af power.

B.

That all the access layer switches that the 802.11n APs will connect to contain 10/100/1000 Ethernet ports.

C.

The location of application and authentication servers.

D.

The proposed location for the WDS server.

E.

The proposed location for the WCS.


 

Correct Answer: B

 

 

QUESTION 57

Aside from software applications, which two tools will be important to have when performing a WLAN site survey? (Choose two.)

 

A.

Measuring tools

B.

Temporary attachment devices (tie-wraps, clamps, duct tape)

C.

Architectural design drawings

D.

Different sizes and types of wrenches and pliers

E.

Portable battery packs to power WLAN clients

F.

Flag tape to outline wireless cell dimensions

 

Correct Answer: AB

 

 

QUESTION 58

Refer to the exhibit. The signal is being degraded to the point of link drops. You have examined the roof and the visual sighting of the remote antenna. What could be causing the issue?

 

clip_image002

 

A.

The receiving antenna is too close to the transmitting antenna.

B.

The first Fresnel zone is more than 60% blocked by the parapet.

C.

The visual line of sight is more than 60% blocked by the parapet.

D.

The cable between the APs and the antennae is introducing too much loss.

E.

The roof material is absorbing too much of the signal.

 

Correct Answer: B

 

 

QUESTION 59

Which three basic pieces of information will you need to perform a WLAN site survey? (Choose three.)

 

A.

How many customer user interviews will be required?

B.

Which network hardwa
re vendor do they currently use for their infrastructure?

C.

What is the location of the facility that needs to be surveyed?

D.

What financial information will my company need to provide to the customer?

E.

How many engineers will be required to perform the work?

F.

What is the expected timeline to complete the project?

 

Correct Answer: CEF

 

 

 

 

QUESTION 60

When discussing a WLAN site survey project with a customer, which four things do you need to know about the scope of the project before starting? (Choose four.)

 

A.

Is the project funded?

B.

Internally, who or which group is driving this project?

C.

Is this a new project, an extension, or a modification to an existing WLAN?

D.

How many APs and controllers are projected to be needed?

E.

How many members of the customer IT staff will require training?

F.

Can the survey be accomplished in the time allotted?

G.

How many user groups will need to be interviewed?

H.

Will site survey engineers need to shadow user as they perform their work duties?

 

Correct Answer: ABCF

 