[Free] 2018(Jan) EnsurePass Testinsides Oracle 1z0-597 Dumps with VCE and PDF 1-10

By | January 25, 2018

Ensurepass.com : Ensure you pass the IT Exams
2018 Jan Oracle Official New Released 1z0-597
100% Free Download! 100% Pass Guaranteed!
http://www.EnsurePass.com/1z0-597.html

SPARC T4-Based Server Installation Essentials

Question No: 1

To disable ILOM CLI session time-out, which command should be used?

  1. Set /SP/cli timeout = n

  2. Set /SP/cli timeout = disable

  3. Set /SP/cli timeout = 0

  4. Set /SP/cli timeout = 1000

Answer: D

Reference:http://docs.oracle.com/cd/E26698_01/html/E26434/ceicefgj.html

Question No: 2

Which three are included for each test in the Enterprise Installation Standards (EIS) Test procedure Plan?

  1. The test objective

  2. The test method

  3. The expected outcome of the test

  4. Troubleshooting for each failed test

Answer: A,B,C

Question No: 3

When setting up Oracle VM Server for SPARC on a SPARC 14 server, you did not remove unneeded PCIe devices from control (primary) domain. What is the impact?

  1. PCIe devices from the control domain can no longer be used in I/O domain.

  2. Removing PCIe devices from the control domain for use in I/O domains requires a delayed reconfiguration and a reboot of the control domain.

  3. You can no longer migrate guest domains to another physical system by means of the domain migration Feature.

  4. There is no impact, as PCIe devices can be dynamically reassigned from the control domain to an I/O domain.

Question No: 4

In planning for the installation of a SPARC T4 server, you notice that a more recent version of a patch is available than what is currently on the EIS-DVD. According to the Enterprise Installation Standards (EIS) methodology, what should you do?

  1. Always install the most recent version of a patch

  2. Delay Installation until the updated patch is published to the EIS-DVD

  3. Do not Install the patch, unless instructed to do so by an EIS-Alert

  4. Never Install patches outside of the EIS-DVD

Answer: A

Question No: 5

The SPARC T4-2 server has than the SPARC T4-1 server.

  1. 512 GB more memory

  2. 1 TB more memory

  3. 64 more compute threads

  4. 128 more compute threads

Answer: B

Question No: 6

When replacing the motherboard, how do you preserve the server’s original host ID and MAC address?

  1. Move the System Configuration PROM from the old motherboard to the new motherboard.

  2. Back up the service processor configuration details from the old system, and restore on the new system.

  3. Move the service processor card from the old system to the new system.

  4. For security, it not possible to preserve the server’s host ID and MAC address.

Question No: 7

Based on the Enterprise Installation Standards (EIS), why should Oracle Explorer Data Collector be run with the “-i” switch after initial system power-on and setup are complete?

  1. To remove confidential customer IP addresses from the Explorer output

  2. To provide a baseline of the initial system configuration

  3. To collect local Intelligent Platform management Interface (IPMI) data

  4. To collect remote Oracle ILOM snapshot data

Answer: C

Question No: 8

What package should be installed if you wish to harden the control domain on a SPARC T4 server running Oracle Solaris 10 and Oracle VM Server for SPARC 2.1?

  1. SUNWldm

  2. SUNWdmp2v

  3. SUNWsst

  4. SUNWjass

Answer: D Reference:http://docs.oracle.com/cd/E27363_01/doc.121/e27511/ftr_ovm_sparc_mgmt.ht m(15.6.2 – see the first note under this heading)

Question No: 9

According to the Enterprise Installation Standards (EIS), what is the recommended minimum number of virtual CPUs that should be allocated to the control domain?

  1. 2 CPUs

  2. 4 CPUs

  3. 6 CPUs

  4. 8 CPUs

Answer: D

Question No: 10

What is main objective of having Enterprise Installation Standards (EIS)?

  1. To create a framework for tracking improperly installed systems

  2. To produce consistent, high quality installations

  3. To produce systems optimized for Oracle software deployments

  4. To create a framework for tracking properly installed systems

Answer: B

100% Ensurepass Free Download!
Download Free Demo:1z0-597 Demo PDF
100% Ensurepass Free Guaranteed!
1z0-597 Dumps

EnsurePass ExamCollection Testking
Lowest Price Guarantee Yes No No
Up-to-Dated Yes No No
Real Questions Yes No No
Explanation Yes No No
PDF VCE Yes No No
Free VCE Simulator Yes No No
Instant Download Yes No No

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.